Peel, Stick, Stuck EternaBond - Instant, Permanent Leak Repair!
Microsealant Technology
USACanadaUKGermanyFranceAustralia/New Zealand - Coming Soon

 

Installation Instructions

Easy to Install - Permanent Results!

Cold Weather Installation using EternaPrime, DoubleStick and gray RoofSeal

* this installation was done on a zero (0° F) degree day.

  After marking the hold cutting it, coat the tape contact once in EternaPrime. Allow to dry (30 min).
*Do not use EternaPrime on PVC. To install EternaBond on PVC in cold temperatures (40° F or below), go to PVC and EternaBond


  Put DoubleStick on the foot of the curb (underside).

  Set in place and secure it down.

  Counter flash the cone with RoofSeal.

  Done!

 


Please email us with comments or problems.

Home  |  Shopping Cart  |  Policies  |  Contact Us

Credit Cards

Copyright © 2008, EternaBond. All Rights Reserved